A Complete Upgrade

This project involved a total upgrade to the Colleges existing facility. Serving a large student body, this project was delivered on-time and on budget, and to our business as usual very high standard.

Exterior & Interior

The exterior was refinished and repainted to last. This included replacement of all of the windows and doors to new and efficient pieces. Inside the floors were replaced and the upgraded fire system was installed to the new safety standards.

New Kitchen and Shower/Toilet Facilities

We built new kitchen facilities where students are also able to be taught, as well as constructing new student shower and toilet blocks. These were constructed to last, ensuring they endure student wear and tear.

© Copyright - Construction Management Group. All Rights Reserved 2018.